I.
Moment of Silence
Meetings are streamed live and archived through the District's YouTube channel at the following link:
JCBE Meeting Videos

This meeting will be conducted via video teleconference pursuant to KRS 61.823 and KRS 61.826. The primary location for this meeting and where all members can be seen and heard by the public will be Stewart Auditorium in the VanHoose Education Center. Members of the Board are permitted to attend in-person or via video teleconference pursuant to KRS 61.826. Members of the public may attend in-person or watch the live stream.
II.
The Pledge of Allegiance
II.A.
Vision Statement
All Jefferson County Public School students graduate prepared, empowered, and inspired to reach their full potential and contribute as thoughtful, responsible citizens of our diverse, shared world.
III.
Recognitions and Resolutions
Order #2026-106 - Motion Passed: Superintendent Brian Yearwood recommends the Board of Education approve the Recognitions for July 21, 2026. The recommendation passed with a motion by Mr. Trevin Bass and a second by Mrs. Linda Duncan.
III.A.
Recognition of Fairdale Elementary PE Teacher Chris Bayens for Being Named the Kyshape Elementary PE Teacher of the Year
Chris Bayens, PE teacher at Fairdale Elementary School, was named Kentucky SHAPE (KYSHAPE) Elementary PE Teacher of the Year at the KYSHAPE Summer Conference in June.
Known for his commitment to creating engaging and inclusive learning environments, Mr. Bayens works to ensure every student develops the skills, confidence, and enjoyment necessary for lifelong physical activity. His leadership within his school community and dedication to student success exemplify the mission of quality physical education.
According to KYSHAPE, their Teachers of the Year award winners represent the very best of health and physical education across the Commonwealth, demonstrating excellence in instruction, leadership, advocacy, and service to students and their school communities.
In addition to being recognized by KYSHAPE, each award recipient will advance as Kentucky’s nominee for SHAPE America Southern District Teacher of the Year consideration within their respective category.
Submitted by Barnard Baker
Superintendent Brian Yearwood recommends the Board of Education recognize Chris Bayens for being named KYSHAPE Elementary PE Teacher of the Year.
III.B.
Recognition of Two JCPS Students Who Were Named as Semifinalists in the 2026 U.S. Presidential Scholars Program
Two JCPS students are among only 12 Kentucky students—and 627 high school students nationwide—named as semifinalists in the 2026 U.S. Presidential Scholars Program for their accomplishments in academics, the arts, and career and technical education fields.
Congratulations to:
-
Deepika Koripelli, duPont Manual Magnet High School
-
Ella S. Xing, duPont Manual Magnet High School
The U.S. Presidential Scholars Program was established in 1964, by executive order of the president, to recognize and honor some of our nation's most distinguished graduating high school seniors. In 1979, the program was extended to recognize students who demonstrate exceptional talent in the visual, creative and performing arts. In 2015, the program was again extended to recognize students who demonstrate ability and accomplishment in career and technical education fields.
Two students from each state, the District of Columbia, Puerto Rico and U.S. families living abroad are selected as U.S. Presidential Scholars. Those students will be announced later this year.
Submitted by Barnard Baker
Superintendent Brian Yearwood recommends the Board of Education recognize Deepika Koripelli and Ella Xing for being named semifinalists in the 2026 U.S. Presidential Scholars Program.
III.C.
Recognition of JCPS Teacher Brandon Riddle for Being Named a 2027 Kentucky Teacher Achievement Award Winner
The Kentucky Department of Education named duPont Manual High School Teacher Brandon Riddle a 2027 Kentucky Teacher Achievement Award winner. Mr. Riddle is one of only nine recipients statewide.
Award winners will be honored during a ceremony in Frankfort on Sept. 9. KDE will announce winners of the elementary, middle and high school teaching divisions during the ceremony. From those three finalists, one will be named the 2027 Kentucky Teacher of the Year. That teacher will represent the state in the National Teacher of the Year competition.
The award winners represent some of the best talent in the state, said Commissioner of Education Robbie Fletcher. KDE received 600 teacher nominations this year. Nominees were interviewed and judged based on their teaching philosophies, teaching experiences, and involvement in their respective communities. Judges also considered letters of recommendation from peers, students, families, administrators and others.
Submitted by Barnard Baker
Superintendent Brian Yearwood recommends the Board of Education recognize JCPS teacher Brandon Riddle for being named a 2027 Kentucky Teacher Achievement Award winner.
III.D.
Recognition of Teach Kentucky Founder and President Rowan Claypool for His Exceptional Contribution to the Education Field
Rowan Claypool will retire this August from his role as president of Teach Kentucky, an organization he founded 25 years ago that has brought hundreds of exceptional educators to JCPS.
Under his visionary leadership, Teach Kentucky has recruited more than 500 alternative-route teachers from 47 states to begin their careers in our district. This vital partnership has profoundly strengthened JCPS by bringing talented, deeply committed educators exactly where they are needed most.
Mr. Claypool—and all who support the Teach Kentucky mission—thank you for your unwavering dedication to cultivating the talent that powers our classrooms and shapes our students' futures.
Submitted by Barnard Baker
Superintendent Brian Yearwood recommends the Board of Education recognize Teach Kentucky Founder Rowan Claypool for his exceptional contribution to education at JCPS.
IV.
Recommendation for Approval of Meeting Agenda
The Superintendent shall consult with the Board Chairperson to ensure that an agenda is prepared for all regular and special meetings of the Board. For special meetings, the Board shall consider only those matters which are listed on the agenda.
Superintendent Brian Yearwood recommends the Board of Education approve the agenda.
Order #2026-107 - Motion Passed: Superintendent Brian Yearwood recommends the Board of Education approve the agenda for July 21, 2026. The recommendation passed with a motion by Mr. Trevin Bass and a second by Mrs. Linda Duncan.
V.
Recommendation for Approval of Minutes of Previous Meeting
The minutes of action taken at every meeting of the Board, setting forth an accurate record of votes and actions at such meetings, shall be promptly recorded, and submitted for approval at the next regularly scheduled meeting, and such records shall be open to public inspection at reasonable times after they have been approved by the Board.
The minutes of the previous meeting(s) are presented for your review and approval.
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the minutes of the previous meeting(s).
Order #2026-108 - Motion Passed: Superintendent Brian Yearwood recommends the Board of Education approve the minutes of the June 30, 2026, business meeting. The recommendation passed with a motion by Ms. Tricia Lister and a second by Mr. Trevin Bass.
VI.
Superintendent's Report
VII.
Persons Requesting to Address the Board on Action Items or Consent Calendar Items to be Voted Upon Separately at Board Member Request
- Speakers before the entire board are not allowed to use props, displays, or any other objects during the presentations. However, informational handouts may be given to the assistant secretary to the board for distribution prior to or following the meeting.
- Each speaker is allowed three minutes to address the board and may not share these minutes with any other speaker.
- At the end of 2-1/2 minutes, a bell will sound once. You will then have 30 seconds to finish your statement.
- At the end of three minutes, the bell will sound twice, indicating that your time is up.
- The superintendent will look into the speakers’ issues and, if necessary, represent the board in following up or recommend action to the board.
- The full Board Policy concerning public participation in open meetings is available for viewing on our Online Policy Manual.
VIII.
Action Items
IX.
Information Items
IX.A.
First Day of School & Transportation Update
In preparation for the upcoming school year starting on August 6, 2026, the Board will receive a briefing on the Transportation Department's readiness plans and preparations being made for the opening day of school.
Submitted by: Dr. Rob Fulk
Superintendent Brian Yearwood recommends the Board of Education receive the First Day of School & Transportation Update.
Order #2026-109 - Motion Passed: Superintendent Brian Yearwood recommends the Board of Education receive the First Day of School & Transportation Update. The recommendation passed with a motion by Mrs. Linda Duncan and a second by Ms. Tricia Lister.
IX.B.
Year-End Cell Phone Report
Pursuant to Board Policy, Internal Audit conducted a year-end review of the District’s school-based cell phone policy to assess the effectiveness and impact of implementation following a complete implementation period. The review examined discipline and behavior trends, student engagement and learning impacts, school culture and climate, and the sustainability of implementation practices across schools.
The year-end report is intended to provide the Board with an assessment of policy effectiveness and outcomes over the full school year, including disciplinary and enforcement impacts not evaluated in the mid-year report, and to inform any recommended refinements to policy, communication, or implementation practices going forward.
Submitted by: May Porter
Order #2026-110 - Motion Passed: Superintendent Brian Yearwood recommends the Board of Education receive the Year-End Cell Phone Report. The recommendation passed with a motion by Ms. Gail Logan Strange and a second by Ms. Tricia Lister.
X.
Consent Calendar
Superintendent Brian Yearwood recommends the Board of Education approve the Consent Calendar.
Order #2026-111 - Motion Passed: A motion that the Board of Education approve the Consent Calendar except consent item X.W Acceptance of Board Policies for First Reading and Receive the Attached Administrative Procedures for Review passed with a motion by Mr. Trevin Bass and a second by Mrs. Linda Duncan.
Order #2026-112 - Motion Passed: A motion to approve consent item X.W Acceptance of Board Policies for First Reading and Receive the Attached Administrative Procedures for Review passed with a motion by Mrs. Linda Duncan and a second by Ms. Gail Logan Strange.
X.A.
Report of Certified Leaves
Pursuant to Kentucky Revised Statutes, leaves of absence must be recommended by the superintendent and approved by the Board of Education.
The following personnel actions are in compliance with federal and state laws and Board policy regarding equal employment opportunities.
Submitted by: Human Resources
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the requests for leaves of absence included in the attachment.
X.B.
Report of Personnel Actions
Pursuant to KRS 160.380, it is the responsibility of staff to report to the Board of Education routine personnel actions that affect certified and classified employment.
These actions have been executed in compliance with all Board of Education policies and state and federal laws.
All positions are Board of Education approved positions.
Submitted by: Human Resources
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached report of personnel actions that he has taken per KRS 160.380.
X.C.
Recommendation for Approval of Organizational Charts and/or Job Descriptions
X.C.1.
WITHDRAWN: Recommendation for Approval of Organizational Charts and/or Job Descriptions – Administration
This agenda item was withdrawn prior to consideration by the Board.
X.C.2.
Recommendation for Approval of Organizational Charts and/or Job Descriptions – Academics
The attached organizational chart(s) and/or job description(s) changes are submitted to create better efficiency in the District. Each division has been listed as a subset of this agenda item.
Submitted by: Human Resources
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached organizational chart(s) and/or job description(s).
X.C.3.
WITHDRAWN: Recommendation for Approval of Organizational Charts and/or Job Descriptions – Exceptional Child Education
This agenda item was withdrawn prior to consideration by the Board.
X.C.4.
Recommendation for Approval of Organizational Charts and/or Job Descriptions – Human Resources
The attached organizational chart(s) and/or job description(s) changes are submitted to create better efficiency in the District. Each division has been listed as a subset of this agenda item.
Submitted by: Human Resources
Attachment
Superintendent Dr. H Brian Yearwood recommends the Board of Education approve the attached organizational chart(s) and/or job description(s).
X.D.
Recommendation of Approval of Field Trips Request and Receipt of Report of Field Trips Approved by the Superintendent
This is a report of field trip requests submitted to the Board of Education on July 21, 2026.
Administrative Regulation 702 KAR 5:060 requires that the use of common-carrier field trips be approved and cited in Board of Education minutes.
Also included is a report of other field trips approved by the superintendent per Board Policy 09.36 Field Trips.
Submitted by: Dr. Rob Fulk
Attachments
Superintendent Brian Yearwood recommends the Board of Education approve the attached report of field trip requests and receive a report of other field trips approved by the superintendent.
X.E.
Recommendation for Approval of BG-1 Forms
X.E.1.
Recommendation for Approval of BG-1 Form for the Phase I HVAC Renovation at Louisville Male High School
This project will replace the entire HVAC system, electrical switchgear, partial roof replacement, security, fire alarm, ceilings, and lights. Exterior windows and minor building renovations may occur.
On June 9, 2026, the Board of Education approved Studio Kremer Architects to prepare plans and specifications for Project 27-001.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the BG-1 form for the Phase I HVAC Renovation at Louisville Male High School, for an estimated project cost of $40,000,000.
X.E.2.
Recommendation for Approval of BG-1 Form for the New School Building at Westport Middle School
This project consists of replacing the deteriorated facility at Westport Middle School on the same site. This project also includes the demolition of the existing Westport Middle School.
On June 9, 2026, the Board of Education approved Pickett Passafiume Architects to prepare plans and specifications for Project 27-004.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the BG-1 form for the New School Building at Westport Middle School, for an estimated project cost of $63,944,300.
X.E.3.
Recommendation for Approval of BG-1 Form to Dispose of the Real Property and Declare the Real Property as Surplus to the Educational Program Needs of the District at Farnsley-Kaufman House
The disposal does not affect the integrity or usefulness of property crucial to the educational needs of the district. The BG-1 form is the official request for permission from the Kentucky Department of Education to dispose of the property by auction or sale.
The Kentucky Department of Education requires that the real property be designated as surplus to meet the requirements of 702 KAR 4:090 Property Disposal.
The project directly supports Vision 2020 Goal Infrastructure Improvements.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the BG-1 form to dispose of the real property at Farnsley-Kaufman House, located at 4816 Cane Run Road, and declare the real property as surplus to the educational needs of the District as determined by the effective district facility plan.
X.F.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 forms
X.F.1.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Pool HVAC Unit Replacement at The Academy @ Shawnee
This project will include the replacement of the indoor air-handling unit and exterior condensing unit along with associated refrigerant piping and any ductwork modifications.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of CMTA, Inc. as the architect/engineer, and the BG-1 form for the Pool HVAC Unit Replacement at The Academy @ Shawnee, for an estimated project cost for $497,296.
X.F.2.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Ballard High School
This project consists of replacing 149 squares of roof in Sections 15 and 17.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Ballard High School, for an estimated project cost for $438,063.
X.F.3.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Sprinkler Replacement at Blankenbaker Bus Compound
This project will consist of replacing the sprinkler pipes and heads throughout the building.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Sprinkler Replacement at Blankenbaker Bus Compound, for an estimated project cost for $115,100.
X.F.4.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Byck Elementary School
This project consists of replacing 175 squares of roof in Section 2.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Byck Elementary School, for an estimated project cost for $512,545.
X.F.5.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Camp Taylor Elementary School
This project consists of replacing 77 squares of roof in Sections 4 and 5.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Camp Taylor Elementary School, for an estimated project cost for $228,625.
X.F.6.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Carter Traditional Elementary School
This project consists of replacing 325 roof squares over the cafeteria, kitchen, and library.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Carter Traditional Elementary School, for an estimated project cost for $943,040.
X.F.7.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Lighting Replacement at Churchill Park School
This project will consist of replacing the old obsolete fluorescent light fixtures with new LED light fixtures.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of BCCLT, Inc. as the architect/engineer, and the BG-1 form for the Lighting Replacement at Churchill Park School, for an estimated project cost for $450,000.
X.F.8.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler and Chiller Replacement at Coleridge-Taylor Montessori Elementary School
This project will consist of replacing the old units with a new boiler and chiller.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler and Chiller Replacement at Coleridge-Taylor Montessori Elementary School, for an estimated project cost for $602,093.
X.F.9.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler Replacement at Dawson Orman Education Center
This project will consist of replacing the old boiler with a new one.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler Replacement at Dawson Orman Education Center, for an estimated project cost for $276,440.
X.F.10.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler and Chiller Replacement at Fern Creek Elementary School
This project will consist of replacing the old units with a new boiler and chiller.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler and Chiller Replacement at Fern Creek Elementary School, for an estimated project cost for $602,093.
X.F.11.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Foster Traditional Academy
This project consists of replacing 361 squares of roof in Sections 1, 2, 5, 9, 10, 11, 12, 14 and 17.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Foster Traditional Academy, for an estimated project cost for $1,045,246.
X.F.12.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler Replacement at Gutermuth Elementary School
This project will consist of replacing the old boiler with a new one.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler Replacement at Gutermuth Elementary School, for an estimated project cost for $276,440.
X.F.13.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Lighting Replacement at Gutermuth Elementary School
This project will consist of replacing the old obsolete fluorescent light fixtures with new LED light fixtures.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of BCCLT, Inc. as the architect/engineer, and the BG-1 form for the Lighting Replacement at Gutermuth Elementary School, for an estimated project cost for $450,000.
X.F.14.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Lighting Replacement at Hartstern Elementary School
This project will consist of replacing the old obsolete fluorescent light fixtures with new LED light fixtures.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of BCCLT, Inc. as the architect/engineer, and the BG-1 form for the Lighting Replacement at Hartstern Elementary School, for an estimated project cost for $450,000.
X.F.15.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Partial Lighting Replacement at Jeffersontown High School
This project will consist of the partial replacement of the old obsolete fluorescent light fixtures with new LED light fixtures.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of BCCLT, Inc. as the architect/engineer, and the BG-1 form for the Partial Lighting Replacement at Jeffersontown High School, for an estimated project cost for $496,598.
X.F.16.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Jeffersontown High School
This project consists of replacing 217 squares of roof in Sections 10A and 10B.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Jeffersontown High School, for an estimated project cost for $633,047.
X.F.17.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Partial Lighting Replacement at Lincoln Elementary Performing Arts School
This project will consist of the partial replacement of the old obsolete fluorescent light fixtures with new LED light fixtures.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of BCCLT, Inc. as the architect/engineer, and the BG-1 form for the Partial Lighting Replacement at Lincoln Elementary Performing Arts School, for an estimated project cost for $394,700.
X.F.18.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Sprinkler Replacement at Nichols Bus Compound
This project will consist of replacing the sprinkler pipes and heads throughout the building.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Sprinkler Replacement at Nichols Bus Compound, for an estimated project cost for $227,000.
X.F.19.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Phoenix School of Discovery
This project consists of replacing roof squares in Sections 1, 2, and 3.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Phoenix School of Discovery, for an estimated project cost for $341,795.
X.F.20.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Semple Elementary School
This project consists of replacing 149 squares of roof in Sections 5 and 6.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Semple Elementary School, for an estimated project cost for $438,063.
X.F.21.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Fire Alarm Replacement at St. Matthews Elementary School
This project includes work to remove and replace the existing fire alarm system with all new panels, devices, wiring and conduits throughout the building.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of BCCLT, Inc. as the architect/engineer, and the BG-1 form for the Fire Alarm Replacement at St. Matthews Elementary School, for an estimated project cost for $276,440.
X.F.22.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Domestic Water Piping Replacement Phase II at Stonestreet Elementary School
This project will consist of replacing portions of the domestic water lines inside the school.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Domestic Water Piping Replacement Phase II at Stonestreet Elementary School, for an estimated project cost for $323,400.
X.F.23.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler Replacement at Thomas Jefferson Middle School
This project will consist of replacing the old boiler with a new one.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler Replacement at Thomas Jefferson Middle School, for an estimated project cost for $287,875.
X.F.24.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Operable Partition Replacement at Various Schools
This project will consist of replacing the operable partitions between the gym and cafeteria at Bates, Blue Lick, Wilder, and Zachary Taylor Elementary Schools.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Tony Kleyer, Architect as the architect/engineer, and the BG-1 form for the Operable Partition Replacement at Various Schools, for an estimated project cost for $390,515.
X.F.25.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Roof Replacement at Western High School
This project consists of replacing 61 squares of roof in Section 2.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of McCulloch Associates Inc. and Environmental Concerns Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Roof Replacement at Western High School, for an estimated project cost for $184,983.
X.F.26.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler Replacement at Whitney Young Elementary School @ Engelhard
This project will consist of replacing the old boiler with a new one.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler Replacement at Whitney Young Elementary School @ Engelhard, for an estimated project cost for $276,440.
X.F.27.
Recommendation for Approval of the Project, Assignment of Architects/Engineers, and BG-1 form for Partial Window Replacement at Whitney Young Elementary School @ Engelhard
This project will consist of the replacement of the existing single pane aluminum frame windows with thermally efficient windows.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Tony Kleyer, Architect and Environmental Concerns, Inc. (Asbestos Abatement Only) as the architects/engineers, and the BG-1 form for the Partial Window Replacement at Whitney Young Elementary School @ Engelhard, for an estimated project cost for $696,830.
X.F.28.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Boiler Replacement at Wilder Elementary School
This project will consist of replacing the old boiler with a new one.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Kerr-Greulich Engineers, Inc. as the architect/engineer, and the BG-1 form for the Boiler Replacement at Wilder Elementary School, for an estimated project cost for $276,440.
X.F.29.
Recommendation for Approval of the Project, Assignment of Architect/Engineer, and BG-1 form for Window Replacement at Wilhoit Bus Compound
This project will consist of the replacement of the existing single pane aluminum frame windows with thermally efficient windows.
Pursuant to the requirements of KRS 322.010 and 323.010, et al. and the policies and procedures of the Jefferson County Public School District, a certified and licensed architect or engineer is assigned to all projects that modify, renovate, or construct additions to existing buildings.
The architect or engineer is responsible for the proper preparation of all plans, specifications, estimates, and direct supervision during the execution of the construction contract. The architect or engineer will supervise the bid process, as required by the District’s Model Procurement Code, and provide an appropriate written recommendation to the district.
The Kentucky Department of Education requires approval of this resolution in order to enter into contracts with the design firms of this project. Plans and specifications will be prepared with this approval.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of approve the project, the assignment of Tony Kleyer, Architect as the architect/engineer, and the BG-1 form for the Window Replacement at Wilhoit Bus Compound, for an estimated project cost for $75,280.
X.G.
Recommendation for Approval of Contract Completions and BG-4 Forms
X.G.1.
Recommendation for Approval of Contract Completion and BG-4 Form for Boiler Replacement at Breckinridge Metropolitan High School
On July 23, 2024, the Board of Education approved Kerr-Greulich Engineers, Inc. to prepare plans and specifications for Project 25-017.
On February 25, 2025, the Board approved awarding a contract to Walker Mechanical Contractors, Inc. as the low bidder.
Kerr-Greulich Engineers, Inc. has made a final inspection and concluded that this contract is complete and final payment is due to the contractor.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the contract completion, the attached BG-4 form, and final payment to Walker Mechanical Contractors, inc. for Boiler Replacement at Breckinridge Metropolitan High School for a total construction cost of $227,951.88.
X.G.2.
Recommendation for Approval of Contract Completion and BG-4 Form for Boiler Replacement at Highland Middle School
On July 23, 2024, the Board of Education approved Kerr-Greulich Engineers, Inc. to prepare plans and specifications for Project 25-019.
On February 25, 2025, the Board approved awarding a contract to Walker Mechanical Contractors, Inc. as the low bidder.
Kerr-Greulich Engineers, Inc. has made a final inspection and concluded that this contract is complete and final payment is due to the contractor.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the contract completion, the attached BG-4 form, and final payment to Walker Mechanical Contractors, inc. for Boiler Replacement at Highland Middle School for a total construction cost of $572,000.
X.H.
Recommendation for Approval of Project Closeouts and BG-5 Forms
X.H.1.
Recommendation for Approval of Project Closeout and BG-5 Form for Boiler and Chiller Replacement at Foster Traditional Academy
On June 9, 2026, the Board of Education approved the contract completion and BG-4 form for Comfort & Process Solutions, LLC.
The Kentucky Department of Education requires the submission of the BG-5 form to reconcile the total project cost to the funding source.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached BG-5 form Boiler and Chiller Replacement at Foster Traditional Academy.
X.H.2.
Recommendation for Approval of Project Closeout and BG-5 Form for Partial Roof Replacement at Western Middle School
On June 9, 2026, the Board of Education approved the contract completion and BG-4 form for Geoghegan Roofing.
The Kentucky Department of Education requires the submission of the BG-5 form to reconcile the total project cost to the funding source.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached BG-5 form Partial Roof Replacement at Western Middle School.
X.I.
Recommendation for Approval of Construction Change Orders
In accordance with 702 KAR 4:160, the Kentucky Department of Education requires that all change orders shall be approved by local board action. Change order descriptions are included in the attachment.
Please note that a found condition represents any item not anticipated during the design phase of the project; and owner request can be any item approved by Facilities staff, often with principal input, to enhance the overall project.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the construction change orders included in the attachment.
X.J.
Recommendation for Approval of Contract Extension and Acceptance of Reimbursement from the Commonwealth of Kentucky for Work Performed at Wilkerson Elementary School (New Elementary School – Dixie Corridor)
On April 12, 2022, the Board of Education approved the original contract and acceptance of reimbursement with an effective date through June 30, 2024.
On May 28, 2024, the Board of Education approved an extension on the original contract with an effective date of June 30, 2026. The effective date is being extended through June 30, 2028. to allow for additional time to complete the project.
A new entrance is needed for the new elementary school being constructed on the existing site of Wilkerson Elementary. Because some of this work requires modification or improvement on the public highway right-of-way on Terry Road, KYTC has agreed to reimburse the District for the value of this work.
These items directly supports Vision 2020 Goal Infrastructure Improvements.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the contract extension and accept reimbursement in the amount of $12,716.00 from the Kentucky Transportation Cabinet Division of Maintenance for modification of an existing entrance at Wilkerson Elementary School (New Elementary School – Dixie Corridor), and authorize the Superintendent to sign same.
X.K.
Recommendation for Approval of Sale and Purchase Agreements
X.K.1.
Recommendation for Approval of Sale and Purchase Agreement for the Purchase of 755 S. Preston Street and 421 Lampton Street
A contract has been prepared for the purchase of 0.6218 acres located at 755 S. Preston Street and 1.4096 acres located at 421 Lampton Street between Louisville Metro Housing Authority and Jefferson County Board of Education for the purchase price of $560,000.
Pursuant to 702 KAR 4:050 the Kentucky Department of Education has given their preliminary approval to purchase this property.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the Sale and Purchase Agreement for the Purchase of 755 S. Preston Street and 421 Lampton Street in the amount of $560,000.
X.K.2.
Recommendation for Approval of Sale and Purchase Agreement for the Purchase of 1400 Bicknell Avenue
A contract has been prepared for the purchase of 12.3245 acres located at 1400 Bicknell Avenue between Louisville Metro Housing Authority and Jefferson County Board of Education for the purchase price of $815,000.
Pursuant to 702 KAR 4:050 the Kentucky Department of Education has given their preliminary approval to purchase this property.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the Sale and Purchase Agreement for the Purchase of 1400 Bicknell Avenue in the amount of $815,000.
X.K.3.
Recommendation for Approval of Sale and Purchase Agreement for the Purchase of 1327 W. Muhammad Ali Boulevard
A contract has been prepared for the purchase of 1.7 acres located at 1327 W. Muhammad Ali Boulevard between Louisville Metro Housing Authority and Jefferson County Board of Education for the purchase price of $387,000.
Pursuant to 702 KAR 4:050 the Kentucky Department of Education has given their preliminary approval to purchase this property.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the Sale and Purchase Agreement for the Purchase of 1327 W. Muhammad Ali Boulevard in the amount of $387,000.
X.K.4.
Recommendation for Approval of Amendment to Sale and Purchase Agreement for the Sale of Real Property at Waller-Williams @ Riverport
On June 30, 2026, the Board of Education approved a contract between the Board of Education of Jefferson County, Kentucky, as Seller, and The Tea Spot, LLC, as Buyer, for the sale of real property at Waller-Williams @ Riverport. This amendment is for the purpose of granting early access to the property prior to closing.
Pursuant to 702 KAR 4:050 the Kentucky Department of Education has given their preliminary approval to purchase this property.
The project directly supports strategy 3.1.1 of Vision 2020.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the Amendment to Sale and Purchase Agreement for the Sale of Real Property at Waller-Williams @ Riverport, located 7401 Riverport Drive, for a purchase price of $945,250; and authorize the superintendent to sign same.
X.L.
Recommendation for Approval of District Facilities Plan Hearing Report and District Facilities Plan
On June 9, 2026, the Board of Education approved the Draft District Facilities Plan. The District Facilities Plan was developed pursuant to 702 KAR 4:180.
Regulations requires that a Local Board Public Hearing be held following Board approval and prior to submission of the report to the Kentucky Board of Education. The hearing was held on June 24, 2026 where the attached report was produced.
After review and approval of the hearing report by the Board, the District Facilities Plan will be submitted to the Kentucky Board of Education, or its designee, for final approval.
The project directly supports strategy 3.1.1 of Vision 2020
Submitted by: Dr. Rob Fulk
Attachments
Superintendent Brian Yearwood recommends the Board of Education approve the attached District Facilities Plan Hearing Report and District Facilities Plan.
X.M.
Recommendation for Approval of Competitive Negotiations, Bid Tabulations, Contract Renewals, and Amendments
In accordance with KRS 45A.345-45A.460, these items represent the lowest and best bid for each respective item or group of items. The proposals are public record and are on file for inspection in the Purchasing Department after award of contract. There are no tie bids.
Submitted by: Thomas Aberli
Attachments
Superintendent Brian Yearwood recommends the Board of Education approve the attached competitive negotiations, bid tabulations, contract renewals, and amendments.
X.N.
Acceptance of Orders of the Treasurer
X.N.1.
Acceptance of Orders of the Treasurer-Invoices
This agenda item is provided to the Board in accordance with Fiscal Management Policy 04.3111 District Issuance of Checks.
Submitted by: Thomas Aberli
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached report of Orders of the Treasurer-Invoices paid and to be paid for the period of June 8, 2026, through June 28, 2026.
X.N.2.
Acceptance of Orders of the Treasurer-Purchase Orders
This agenda item is provided to the Board in accordance with Fiscal Management Policy 04.3111 District Issuance of Checks.
Submitted by: Thomas Aberli
Attachments
Superintendent Brian Yearwood recommends the Board of Education receive the attached report of Orders of the Treasurer-Purchase Orders issued during the period of June 8, 2026, through June 28, 2026.
X.N.3.
Acceptance of Orders of the Treasurer-Vouchers
This agenda item is provided to the Board in accordance with Fiscal Management Policy 04.3111 District Issuance of Checks.
Submitted by: Thomas Aberli
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached report of Orders of the Treasurer-Vouchers paid during the period of June 8, 2026, through June 28, 2026.
X.O.
Recommendation for Approval of Resolutions Concerning the Jefferson County School District General Obligation Bonds
The approval of the attached Resolutions approves, ratifies and confirms the actions of the Jefferson County School District in order to effect the issuance of the District’s General Obligation Bonds, Series 2026A (the “Series 2026A GO Bonds”).
Submitted by: Thomas Aberli
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Resolutions concerning the Jefferson County School District General Obligation Bonds.
X.P.
Recommendation for Approval of the Issuance of a Revenue Anticipation Note (RAN), Series 2026N
The approval of the attached Resolutions approves, ratifies and confirms the actions of the Jefferson County School District in order to effect the issuance of the District’s Revenue Anticipation Note (RAN), Series 2026N (the “Series 2026N Notes”).
Submitted by: Thomas Aberli
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Resolutions concerning the Jefferson County School District's issuance of a Revenue Anticipation Note, Series 2026N.
X.Q.
Acceptance of Donations, Grants, and Funding
X.Q.1.
Acceptance of Donations and Small Grants
Schools solicit donations for current needs or a specific purpose or project. Undesignated donations are used at the discretion of the school or the School-Based Decision-Making (SBDM) Council.
Small grants include non-federal awards of less than $50,000.
Submitted by: Dr. Marco Muñoz
Attachment
Superintendent Brian Yearwood recommends the Board of Education accept donations and small grants totaling $244,109.13 to be used as stated in the attachment.
X.Q.2.
Acceptance of Funding from the Jefferson County Public Education Foundation
Steel Technologies Foundation donated $1,200 to be used to support the JCPS adaptive sports team, Louisville Lightning.
Submitted by: Dr. Thomas Aberli
Superintendent Brian Yearwood recommends the Board of Education accept funding totaling $1,200 from the Jefferson County Public Education Foundation to be used as stated in the rationale.
X.Q.3.
Acceptance of Funding from the Kentucky Department of Education for Exceptional Child Education
The Kentucky Department of Education (KDE) has approved funding for the Greater Louisville Education Cooperative’s (GLEC) 2026–2027 Special Education Regional Technical Assistance Center (SERTAC) proposal through Individuals with Disabilities Education Act (IDEA) Part B funds.
GLEC will provide training and technical assistance to support improved outcomes for students with disabilities, including evidence-based instructional practices, behavioral supports, and strategies to increase academic achievement. These services support teachers in meeting the needs of students with disabilities and improving postsecondary outcomes.
Submitted by: Nina Beck
Attachment
Superintendent Brian Yearwood recommends the Board of Education accept funding from the Kentucky Department of Education in the amount of $1,035,800 to fund the Greater Louisville Education Cooperative’s 2026–2027 Special Education Regional Technical Assistance Center (SERTAC) proposal.
X.Q.4.
Acceptance of the Kentucky Office of Homeland Security Grant
The Kentucky Office of Homeland Security has awarded the district a $77,171 Law Enforcement Protection Program grant to purchase equipment for the JCPS Police Department.
There is no obligation for the District beyond June 30, 2027.
Submitted by: Todd Kessinger
Attachment
Superintendent Brian Yearwood recommends the Board of Education accept funding totaling $77,171 from the Kentucky Office of Homeland Security and authorize the superintendent to sign the attached agreement.
X.Q.5.
Acceptance of Perkins Career and Technical Education Funding Allocation and District Assurances
Federal Perkins funding provides the District with approximately $1.8 million annually to support high-quality Career and Technical Education (CTE) programs across all district high schools. These funds are essential for expanding and sustaining CTE pathways that prepare students for postsecondary education, industry-recognized credentials, military service, and high-demand careers aligned with local, regional, and state workforce needs.
These annual federal funds enable the district to maintain equitable access to rigorous, high-quality CTE programming in every high school while ensuring compliance with federal Perkins requirements and Kentucky Career and Technical Education standards. Continued investment supports student achievement, increases college and career readiness, expands credential attainment, and strengthens partnerships with business and industry to develop a highly skilled workforce.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education accept the FY 2027 Perkins Grant Award in the amount of $1,811,814.00, approve the accompanying District Funding Assurances, and authorize the Superintendent to sign the same.
X.Q.6.
Acceptance of Additional Funding from The Wallace Foundation
The original grant agreement with The Wallace Foundation was approved on September 14, 2021, and is being extending our grant an additional year. The Wallace Foundation is continuing the Equity Centered Pipeline Initiative (ECPI) in Jefferson County Public Schools to develop a broadly applicable approach for a comprehensive, aligned pipeline that produces equity-centered district and school leaders with the knowledge and skills to make educational equity a reality. The funding being provided will be allocated among JCPS and identified grant partners. Our grant partners will submit reimbursements to access funding identified for them in the grant.
Submitted by: Robert Moore
Attachments
Superintendent Brian Yearwood recommends the Board of Education accept additional funding of $1,080,000 from The Wallace Foundation and authorize the superintendent to sign the attached grant agreement amendment.
X.Q.7.
Acceptance of Grants from WHAS Crusade for Children to Support Exceptional Child Education Programs
The WHAS Crusade for Children has awarded the District six grants totaling $191,765. The grants will help children overcome physical, mental, emotional, and medical challenges by providing assistive technology, software, curriculum, and other tools that help them break through barriers to learning, participate more fully in the classroom setting, and helps eliminate achievement, learning, and opportunity gaps. WHAS Crusade for Children awarded funding to the following seven ECE areas: Assistive Technology, Deaf/Hard of Hearing, Early Childhood Diagnostic Center, Moderate and Severe Disabilities, Occupational Therapy and Physical Therapy, and Visually Impaired. The District is not required to commit any matching funding to these projects and has no obligation beyond the end date of the grant.
Submitted by: Nina Beck
Attachment
Superintendent Brian Yearwood recommends the Board of Education accept seven grants from WHAS Crusade for Children totaling $191,765 to support Exceptional Child Education programs and authorize the superintendent to sign the attached grant acceptance forms.
X.R.
Recommendation for Approval of Agreements
X.R.1.
Recommendation for Approval of Amendment to Lease with Adventurous Minds Produce Extraordinary Dreams (AMPED)
Adventurous Minds Produce Extraordinary Dreams (AMPED) will continue to provide leased space for six months beginning August 1, 2026, at 2500 W. Broadway to be used as the West Louisville location of the Elev8 Student Learning Center. The current lease expires July 31, 2026. This will allow continued student learning opportunities and success toward graduation for students.
Submitted by: Dr. Alicia Averette
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the amendment to lease with Adventurous Minds Produce Extraordinary Dreams (AMPED) and authorize the superintendent to sign the same.
X.R.2.
Recommendation for Approval of Memorandum of Agreement with The Commonwealth of Kentucky, Education and Labor Cabinet, Office of Vocational Rehabilitation
The Exceptional Child Education (ECE) Department will collaborate with The Commonwealth of Kentucky, Education and Labor Cabinet, Office of Vocational Rehabilitation (OVR) to establish an agreement for the Community Work Transition Program (CWTP) for the 2026–2027 school year.
This program is designed to assist OVR-eligible and potentially eligible students with disabilities who have identified employment as a desired post-school outcome and require support transitioning from high school to competitive integrated employment.
The goal of this program is community work exploration and competitive integrated employment. JCPS job trainers will be trained annually on CWTP policies and procedures and will collaborate with OVR counselors and school personnel to identify eligible students. Under the supervision of the ECE Department, job trainers will invoice OVR for services rendered to OVR-approved students. Job trainers will collaborate with school personnel to identify students for CWTP.
Submitted by: Nina Beck
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with the Commonwealth of Kentucky, Education and Labor Cabinet, Office of Vocational Rehabilitation, and authorize the superintendent to sign the same.
X.R.3.
Recommendation for Approval of Memorandum of Agreement with Hope Collaborative
Hope Collaborative will provide students small group mentoring activities that improve cognitive, emotional, social skills and academic performance.
The project directly supports Vision 2020 Deeper Learning 3.2.1. and 3.3.1, which states that each student will have access to responsive services using best practices to strengthen relationships with families, stakeholders, and the community.
Submitted by: Dr. Alicia Averette
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with Hope Collaborative and authorize the superintendent to sign the same.
X.R.4.
Recommendation for Approval of the Confidential Data Privacy Agreement with Imagine Learning LLC
This data privacy agreement protects student data and access to the Imagine Learning Classroom for EL Education & IM360 adopted high quality instructional resources and aligns to approved district bid 3170 for digital instructional resources. This work supports Goals and Guardrails #4: 3rd Grade Literacy and #5: 8th Grade Numeracy.
Submitted by: Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Data Privacy Agreement with Imagine Learning LLC and authorize the superintendent to sign the same.
X.R.5.
Recommendation for Approval of Amendment to Memorandum of Agreement with Jefferson Community & Technical College
The Memorandum of Agreement (MOA) between Jefferson County Public Schools (JCPS) Adult Education and Jefferson Community and Technical College (JCTC) strengthens the District's commitment to expanding postsecondary access and workforce readiness for adult learners. This partnership provides eligible students with the opportunity to be concurrently enrolled in JCPS Adult Education and JCTC, creating a seamless transition from adult education into postsecondary coursework and career training programs.
The agreement reduces barriers to higher education by aligning educational supports, advising, and enrollment processes, enabling students to earn college credit and workforce credentials while completing their educational goals. Through coordinated services, students are better positioned to pursue high-demand career pathways, improve employment opportunities, and achieve long-term economic self-sufficiency.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Amendment to the Memorandum of Agreement with Jefferson Community & Technical College and authorize the superintendent to sign the same.
X.R.6.
Recommendation for Approval of Data Privacy Agreement with Little Bee Speech Co.
The Exceptional Child Education (ECE) Department will utilize speech therapy software provided by Little Bee Speech Co. to support the assessment and remediation of speech sound disorders for students.
In order to provide these services, the Board of Education must enter into a Data Privacy Agreement (DPA) with the provider. The DPA ensures compliance with federal and state data privacy laws, including FERPA, and establishes requirements for the protection, use, and security of student information.
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Data Privacy Agreement with Little Bee Speech Co. and authorize the superintendent to sign the same.
X.R.7.
Recommendation for Approval of Memorandum of Agreement with Louisville Folk School
The services provided by the Louisville Folk School support the District's commitment to providing students with engaging, high-quality educational experiences that foster creativity, collaboration, and personal growth. Through instruction in traditional music, arts, and cultural programming, the Louisville Folk School offers students authentic learning opportunities that enhance fine arts education while promoting cultural awareness, self-expression, and community engagement.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with Louisville Folk School and authorize the superintendent to sign the same.
X.R.8.
Recommendation for Approval of Agreement with Louisville Urban League Sports & Learning Complex DBA Norton Healthcare Sports & Learning Center
This Event License Agreement establishes the terms and conditions for the Annual JCPS Administrator’s Leadership Retreat. Hosted by Dr. Yearwood, the event is scheduled to take place on Thursday, July 30, 2026.
Submitted by: Barnard Baker
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Event License Agreement with the Louisville Urban League Sports & Learning Complex, DBA Norton Healthcare Sports & Learning Center, and authorize the superintendent to sign the same.
X.R.9.
Recommendation for Approval of Memorandum of Agreement with See Forward Ministries Corporation
This Memorandum of Agreement (MOA) establishes a partnership with See Forward to implement services funded through the Kentucky Office for Refugees (KOR) Youth Mentoring (YM) Grant. Through this grant, See Forward will provide one-on-one and group mentoring services to approximately 100 Office of Refugee Resettlement (ORR)-eligible refugee and immigrant students, ages 15–24, enrolled at Newcomer Academy, Seneca High School, and Iroquois High School.
The program is designed to support students' academic success, social-emotional well-being, and successful integration into school and community life by providing culturally and linguistically responsive mentoring. Services will be delivered in students' primary languages, including Kinyarwanda, Kinyamulenge, Kirundi, Swahili, French, Lingala, and Bembe, helping reduce barriers to engagement and access. This partnership aligns with the district's commitment to equitable educational opportunities and targeted supports for multilingual learners and newcomer students.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with See Forward Ministries Corporation and authorize the superintendent to sign the same.
X.R.10.
Recommendation for Approval of the Data Privacy Agreement with Wisconsin Center for Education Products and Services (WIDA)
The Wisconsin Center for Education Products and Services (WIDA) provides a comprehensive, research-based system of English language development standards, assessments, instructional resources, and professional learning designed to support multilingual learners (MLs). WIDA resources equip educators with the tools necessary to deliver standards-aligned, language-rich instruction that promotes academic achievement while accelerating English language acquisition across all content areas.
Submitted by: Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Data Privacy Agreement with Wisconsin Center for Education Products and Services (WIDA) and authorize the superintendent to sign the same.
X.R.11.
Recommendation for Approval of Confidential Data Privacy Agreement with Curriculum Associates (i-Ready)
This Data Privacy Agreement (DPA) with Curriculum Associates establishes the terms for the secure collection, use, storage, and protection of student data associated with the i-Ready platform in accordance with applicable federal and state privacy laws, including the Family Educational Rights and Privacy Act (FERPA). i-Ready provides standards-aligned diagnostic assessments and personalized instructional resources that support student learning, monitor academic progress, and inform instructional decision-making in reading and mathematics. Executing this agreement ensures the district can utilize the i-Ready platform while maintaining compliance with student data privacy and security requirements.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Confidential Data Privacy Agreement with Curriculum Associates (i-Ready) and authorize the superintendent to sign the same.
X.R.12.
Recommendation for Approval of Amendment to Data Privacy Agreement with PowerSchool Group United Home Platform
The broad purpose of PowerSchool Unified Home will help JCPS increase student instructional time by employing a data-driven, Attendance Management System that will enable JCPS to analyze attendance data using visualizations and share insights across school communities. Requesting an amendment to the compensation section of the Data Privacy Agreement (DPA) to say "funds for purchase shall come from JCPS Title I/II/IV Program office budgets". The purpose of this agreement is to delineate the operational guidelines for sharing data between PowerSchool and JCPS and define respective roles and responsibilities
of each party. Data sharing will begin upon acceptance of this agreement. All procedures and processes will be FERPA compliant. Period, scope, and protections are also outlined in the attached agreement.
Submitted by: Dr. Katy DeFerrari
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached amendment to the Data Privacy Agreement with PowerSchool Group United Home Platform and authorize the superintendent to sign the same.
X.R.13.
Recommendation for Approval of the Confidential Data Privacy Agreement with GoFan
Approval of the GoFan Data Privacy Agreement ensures that Jefferson County Public Schools can continue to utilize the GoFan platform for digital ticketing and event management while establishing contractual protections for the collection, use, storage, and security of student and user data. The agreement outlines each party's responsibilities regarding data privacy and compliance with applicable federal and state student privacy laws, helping safeguard personally identifiable information while supporting efficient management of school athletic, fine arts, and extracurricular events. This agreement promotes secure digital operations and protects the district's interests through clearly defined data governance practices.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Confidential Data Privacy Agreement with GoFan and authorize the superintendent to sign same.
X.R.14.
Recommendation for Approval of Memorandum of Agreement with Teach Kentucky, Inc
The mission of Teach Kentucky, Inc. is to recruit teachers to Jefferson County Public Schools (JCPS). Teach Kentucky launches the education careers of college graduates from across the nation to JCPS. The expansion of the JCPS – Teach Kentucky partnership will include a focus of supporting the District’s diversity hiring goals and sustainable support of the long-standing collaborative recruitment process.
Submitted by: Human Resources
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with Teach Kentucky, Inc. and authorize the superintendent to sign the same.
X.R.15.
Recommendation for Approval of Memorandum of Agreement with Trilogy Health
This Memorandum of Agreement establishes a partnership between Jefferson County Public Schools (JCPS) and Trilogy Health Services to provide students enrolled in Health Science Career and Technical Education (CTE) pathways with access to supervised clinical learning experiences. These clinical experiences are required to meet state industry standards and provide students with authentic, hands-on training in healthcare settings.
The partnership supports the district's commitment to preparing students for high-demand healthcare careers by allowing them to apply classroom instruction in real-world environments while developing the knowledge, technical skills, and professional competencies necessary for industry certification and postsecondary success. This agreement aligns with Career and Technical Education pathway requirements and supports JCPS's mission to provide students with high-quality, career-focused learning opportunities.
Submitted by Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with Trilogy Health and authorize the superintendent to sign the same.
X.R.16.
WITHDRAWN: Recommendation for Approval of Memorandum of Agreement with the Jefferson County Teachers Association
This agenda item was withdrawn prior to consideration by the Board.
X.R.17.
Recommendation for Approval of Memorandum of Agreement with the Teamsters Local 783 to Update the 1B Salary Schedule
The terms of the attached Memorandum of Agreement with the Teamsters Local 783 provides changes to the 1B Salary Schedule and adjusts named positions upward to meet market comparability. In addition, an agreement to maintain temporary salary adjustments for specific role groups are outlined for the 2026-27 and 2027-28 school years.
Submitted by: Human Resources
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the attached Memorandum of Agreement with Teamsters Local 783.
X.R.18.
WITHDRAWN: Recommendation for Approval of Payment-in-Lieu-of-Taxes Agreement with Louisville/Jefferson County Metro Government
This agenda item was withdrawn prior to consideration by the Board.
X.S.
Recommendation for Approval of the Use of the Kentucky Department of Education Course Code 909999 by Schools
Per 704 KAR 3:540, local school districts and schools shall use uniform academic course codes, listed and described in the Academic Course Code List, to classify all courses offered in each school when reporting to the Kentucky Department of Education (KDE). Additionally, local school boards must approve any course linked to KDE code 909999-school defined course.
Attached is a list of these courses and course notes for JCPS. Several of these courses are linked to specialized magnet programming at a particular school. Several others are holding courses to “save a place” in a student’s schedule for performance-based learning opportunities (courses that are funded based on standard completion as opposed to completion of time-based courses). Per KDE processes, all students must have a complete schedule for calculation of attendance and funding.
Submitted by: Robert Moore
Attachment
Superintendent Brian Yearwood recommends the Board of Education approve the use of the Kentucky Department of Education state code 909999 (school-defined course) for select JCPS Course Codes.
X.T.
Recommendation for Approval of Updated 2026-27 Salary Schedules
The attached documents are recommended for approval to update the District's salary schedules for the 2026-27 school year with the following:
- Align pay rates for Security Training Stipend-KY Law Enforcement Foundation
Program Fund with rates in compliance with KRS 15.410-15.510.
- Additional of a classified substitute stipend for a new job description Substitute
Sectional Instructors in Job Family 6 (SUBC).
Submitted by: Thomas Aberli
Attachments
Superintendent Brian Yearwood recommends the Board of Education approve the attached updated 2026-27 Salary Schedules.
X.U.
Acceptance of Board Policies for First Reading and Receive the Attached Administrative Procedures for Review
The Board Policy Committee reviewed these policies and administrative procedures during its meeting on June 22, 2026. The policies are recommended for approval and the administrative procedure is provided for review by the Board.
Board Policies and Administrative Procedure
09.314 Videographer/Photographer Approval (Athletics)
09.4261 Telecommunication Devices
09.224 AP.21 Nurse Office Consent for Treatment/Emergency Information
09.428111 AP.1 Notice to Individuals Regarding Title IX Sexual
Harassment/ Discrimination
Submitted by Kevin C. Brown
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached Board Policies for first submission and reading and receive the attached Administrative Procedures for review.
X.V.
WITHDRAWN: Acceptance of Board Policies for First Reading and Receipt of the Attached Administrative Procedures for Review
This agenda item was withdrawn prior to consideration by the Board.
X.W.
Acceptance of Board Policies for First Reading and Receive the Attached Administrative Procedures for Review
Each year, the Kentucky School Boards Association prepares draft amendments to Board policies and administrative procedures based on legislation passed by the Kentucky General Assembly, as well as other changes to state and federal law and regulation. KRS 160.340 requires that these policies be approved by the Board annually by August 15.
The Board Policy Committee reviewed these policies and administrative procedures during its meeting on July 13, 2026, which are recommended for review and approval by the Board.
01.0 Definitions
01.11 General Powers and Duties of the Board
01.111 District Planning
01.41 Organizational Board Meetings
01.411 Duties and Responsibilities of Chair and Vice-Chair
01.42 Regular Board Meetings
01.44 Special Called Meetings
01.83I In-service Training
02.131 Contract of Superintendent
02.31 School Resource Officers (SROs)
02.423 School Council Meetings (SBDM)
02.4242 School Budget and Purchasing (SBDM)
02.442 Comprehensive School Improvement Plan
03.11 Hiring
DE03.121 Salaries
03.1311 Transfer
03.1321 Use of School Property
03.1324 Political Activities
03.19 Staff Meetings and Professional Development
03.21 Hiring
03.2311 Transfer
03.2321 Use of School Property
03.2324 Political Activities
03.29 Staff Meetings and Professional Development
04.1 Budget Planning and Adoption
04.1 AP.11 Budget Calendar and Timeline
04.31 Fiscal Accounting & Authority to Encumber/Expend Funds
04.311 District Accounts
04.32 Model Procurement Code Purchasing
04.91 Financial Statements and Reports
05.4 Safety
05.48 Weapons
06.2 Transportation Safety
06.31 Bus Scheduling and Routing
07.111 Competitive Foods
07.13 School and Community Nutrition Procurement
07.13 AP.1 Procurement of School Nutrition Service Supplies
08.1 Curriculum
08.1313 Dyslexia
08.1341 Essential Workplace Programs
08.1346 Physical Education
08.215 Writing Program
08.231 Religious Beliefs Excusal
08.231 AP.21 Religious Beliefs Excusal Process
08.2323 Access to Electronic Media
08.2324 Traceable Communications
08.2324 AP.1 Traceable Communications
05.51 AP.21 Employee Acceptable Use Agreement
08.2324 AP.2 Consent for Outside Traceable Communications
09.2211 Employee Reports of Criminal Activity
09.227 Child Abuse
09.3 Student Activities
09.425 Assault and Threats of Violence
09.43 Student Disciplinary Processes
09.435 Expulsion
01.1 Legal Status of the Board
01.2 Board Member Qualifications
09.2261 Transportation Services Policy
09.12 AP.1 Student Enrollment and Homeless/Foster Care Status
Submitted by: Kevin C. Brown
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached Board Policies for first submission and reading and receive the attached Administrative Procedures for review.
X.X.
Acceptance of Board Policies for First Reading
Deletion of Reference to Charter Schools in Board Policy
The Kentucky Supreme Court declared charter schools unconstitutional, so all references to charter schools are being deleted in Board policies.
Repeal
01.91 Authorization of Charter Schools
01.911 Charter School Application Process
01.9111 Charter School Contract
01.912 Charter School Monitoring, Assessment, and Annual Reports
01.9121 Charter School Finance and Transparency
01.913 Charter School Renewal, Non-Renewal, Revocation, and Closure
Amend
03.1235 Education/Professional Leave (Certified)
09.11 School Choice System
09.12 Admissions and Attendance
09.313 Eligibility (Athletics)
01.3 AP.2 Board Vacancy Forms
Job Title Changes
The recent Reorganization/Job Description changes require amendments to Board policies.
01.413 Duties and Responsibilities of the Treasurer
04.12 School Activity Accounts Budgets
04.7 Inventories
04.9 Audits
07.1 Food/School Nutrition Services
07.12 Vending Machines
07.14 Financial Reports – School and Community Nutrition Services
09.4281 Reporting Educational Concerns or Grievances
10.2 Citizen Suggestions and Complaints
Submitted by Kevin C. Brown
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached Board Policies for first submission and reading and receive the attached Administrative Procedures for review.
X.Y.
Recommendation to Adopt the Attached Board Policies (Second Reading)
The Board Policy Committee reviewed these policies during its meeting on June 22, 2026. The policies received their first reading at the June 30, 2026, Board meeting.
Board Policies
03.14 Health and Safety (Certified)
03.24 Health and Safety (Classified)
03.1234 Medical Leave (Certified)
03.2234 Medical Leave (Classified)
08.1348 Certified Oral and Written Language Support
Submitted by Kevin C. Brown
Attachment
Superintendent Brian Yearwood recommends the Board of Education adopt the attached Board policies.
X.Z.
Acceptance of the Annual Facility Performance Index (FPI) Report
The annual Facility Performance Index (FPI) Report provides a comprehensive review of district facility conditions, school-level per-pupil expenditures, and districtwide enrollment trends. This year's report also includes a Board district-level analysis of historical capital improvements, school construction projects, facility closures, and population growth trends that may impact future enrollment and facility needs. The report serves as a key planning resource to support informed decision-making regarding capital investments, resource allocation, facility use, and the long-term operational needs of the district.
Submitted by: Dr. Rob Fulk
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive and review the Annual Facility Performance Index (FPI) Report as presented to inform long-range District planning and future decision-making.
X.AA.
Recommendation for Approval of Professional Services Contracts of $20,000 or More
In accordance with Board Policy 01.11 General Powers and Duties of the Board, professional services contracts of $20,000 or more require Board approval.
Submitted by: Thomas Aberli
Attachments
Superintendent Brian Yearwood recommends the Board of Education approve the attached professional services contracts of $20,000 or more.
X.BB.
Acceptance of Summary of Professional Services Contracts
This summary includes all professional services contracts approved as of July 1, 2026 and supports Vision 2020 Strategy 3.1.4 Ensure responsible stewardship of resources.
KRS 160.370 was amended to allow the Board to authorize the superintendent to approve purchases for any contract for which a determination is made that the aggregate amount of the contract is less than $20,000.
Submitted by: Thomas Aberli
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached Summary of Professional Services Contracts.
XI.
Board Planning Calendar
Board members may review and offer suggestions for future Board meeting agendas during the Board Planning Calendar portion of regular Board meetings.
A list of selected Board of Education discussion agenda items has been compiled for use by the Board and administrative staff. The list includes activities for action and discussion.
It is anticipated that staff will use this list to avoid scheduling conflicts, improve coordination and support of activities, enhance planning, and increase awareness of upcoming board meeting activities.
Attachment
Superintendent Brian Yearwood recommends the Board of Education receive the attached planning calendar outlining discussion agenda items.
Order #2026-113 - Motion Passed: Superintendent Brian Yearwood recommends the Board of Education receive the attached planning calendar outlining discussion agenda items. The recommendation passed with a motion by Mr. Trevin Bass and a second by Mrs. Linda Duncan.
XII.
Committee Reports
Meeting dates and times can be accessed on the JCPS Calendar of Events. Meeting materials and Minutes from previous meetings can be accessed here.
XIII.
Board Reports
Each meeting shall contain an opportunity for Board members to report on noteworthy events pertaining to the work of schools and the District.
XIV.
Persons Requesting to Address the Board (If Necessary)
XV.
Executive Session (If Necessary)
XVI.
Action Item (If Necessary)
XVII.
Adjournment
A motion to adjourn the meeting of the Jefferson County Board of Education.
Order #2026-114 - Motion Passed: A motion to adjourn the July 21, 2026, meeting of the Jefferson County Board of Education at 7:55 p.m. passed with a motion by Mr. Trevin Bass and a second by Mrs. Linda Duncan.
|